The project will widen SR 741 between Spy Glass Hill and Welden Drive to include two lanes of travel in each direction with left turn lanes at all intersections. The project will also include new signals at US 42 and Bethany Road with backplates, street trees, street lighting, a shared use path, sidewalk and right turn lanes on eastbound Bethany Road and eastbound US 42. The project will also add a proposed bike path connection along the north side of Bethany starting at SR 741 and connecting with the existing bike path at Windemere Way.
Public Involvement Letter
Roll Plot - Bethany
Roll Plot - SR 741
Roll Plot - US 42
Project Timeline:
Design: 2018 to 2020
Right of Way: 2019-2020
Construction: Spring/Summer 2021
Current Status: Working on Right of Way acquisition for the project and utility relocation coordination as well as Stage 3 plan design.